3 criteria to keep in mind for your next pre-piling template

When installing an offshore wind turbine in 50-80 meter water depth, using a jacket foundation is an obvious choice. To install the pin-piles for the jacket, a pre-piling template is an excellent structure to ensure precise installation. Moving to new areas with different circumstances brings along new operational challenges. A few examples: 1. Deeper water In 2015 […]

How to meet strict installation tolerances with a pre-piling template?

With offshore wind farms moving to deeper water, and the WTG also increasing in size, we see other foundations than the good old monopile. When using a jacket foundation a pre-piling template helps to speed up the installation process. However, this is only useful when the pre-piling template guarantees that the required installation tolerances are […]

Van carrièrebeurs tot afstuderen

With the upcoming Business Days Twente, we are looking back at one of the success stories of a previous edition. At the career fair we always meet many talented and driven engineering students. Here’s an interview with one of those students who after meeting at the event found a place at KENC. Harmen Punte was […]

KENC awarded with jacket seafastening scope

KENC has been awarded an engineering contract for the seafastening of two large jackets. These large jackets are integral components of an offshore high voltage station (OHVS). Upon completion, the offshore windfarm will stand as the largest and most powerful offshore windfarm in the Baltic sea boasting an impressive total capacity of 927 megawatts. KENC’s scope […]

Van Oord installs first monopile using KENC’s Flange Monopile Upending Tool

KENC Engineering is proud to announce that – using our purpose-built Flange Monopile Upending Tool (FMUT) – Van Oord has installed the first monopile foundation at an Offshore Wind Farm in the UK. In the coming months, Van Oord will install a total of 100 monopile foundations at this North Sea location. KENC Engineering was […]