SEAFASTENING & GRILLAGES

Jumbo awarded KENC with multiple engineering assignments. The scope entailed engineering and FEM calculations to prepare Jumbo’s ‘Fairplayer’ – a DP 2 heavy lift crane vessel (HLCV) – for an FPSO installation job offshore Brazil. The assignments included engineering of a 192 tonnes gypsy winch grillage and an over boarding tool to handle 120t torpedo piles. FEM calculations were performed on all constructions including the effects on local hull structure.

The single point of contact for Jumbo was KENC’s manager engineering Cor Hilbrink. Within four months we successfully delivered all calculations and engineering work to full satisfaction of Jumbo.

WHAT OUR
CLIENTS SAY

Early 2020 kenc delivered multiple engineering assigments to Jumbo, including a 192 tonnes gypsy winch grillage and overboarding tool.

“WE ARE VERY HAPPY WITH THE PLEASANT COLLABORATION. KENC DELIVERED WELL ON TIME AND MADE A POSITIVE IMPACT ON THE LEAD TIME OF THE PROJECT.”

Jeroen Alberts, lead engineer at Jumbo

LET’S FIND OUT WHAT WE CAN DO TOGETHER

We love to hear from you! Give me a call or send an e-mail.

Buisness developer Vincent Vinkoert from kenc

Vincent Vinkoert
Business Development Manager

+31 6 308 469 86 | vincent.vinkoert@kenc.nl

NEED HELP? LET US KNOW HOW WE CAN BE OF SERVICE

This form is protected with ReCaptcha. By submitting this form you automatically agree with our privacy policy.