We designed the Monopile Lifting Tool, also known as Flange Monopile Upending Tool enabling more efficient and safer monopile installations in offshore wind farms. See also Y-Class Monopile Lifting Tool.
In offshore wind farm construction, installing monopiles is one of the most crucial steps. Operators require a tool that combines strength, efficiency, and ease of use. The tool must be robust enough to handle substantial loads, yet light enough to fit within the vessel’s crane capacity. For projects with flange diameters between 7.5 and 8 meters, a precise and reliable upending tool is essential to prevent downtime, delays, and potential damage to monopiles, which can be costly in both time and resources.
Traditional monopile handling tools may lack the combination of strength, precision, and flexibility required for large-scale offshore installations. Van Oord needed a tool that can:
Safely lift, upend, and downed heavy monopiles
Integrate seamlessly with other deck tools, such as monopile grippers
Provide safe, hands-free operations
Minimizes surface damage to the monopile and flange
Be customizable for different project requirements and vessel layouts
We developed the Y-Class, a state-of-the-art monopile upending tool designed for large-scale monopile installations. The Y-1600 handles a Safe Working Load (SWL) of up to 1,600 tons while remaining lightweight at 60 tons, enabling efficient handling even in challenging side leads. The tool integrates with the deck spread, paired with other crucial tools such as the monopile gripper.
Key features:
Efficient handling and safety: tugger points rated for 25-ton loads, Quick Connector compatibility, fixed locking system, remote control with manual override, and visual indicators with sensors and cameras for real-time monitoring
Enhanced protection: protective materials safeguard the monopile and flange surfaces, minimizing wear and ensuring durability
Optional upgrades: seafastening cradle, stabbing frame, and upend bucket allow for versatile configurations to meet specific project needs
Optimized for uptime: lightweight, robust construction and streamlined production reduce installation time and help ensure timely project starts
Key specifications:
Flange Diameter Compatibility: 7.5 – 8 meters
SWL: 1,600 tons
Upending Load: 900 tons
Tool Weight: 60 tons
Safe and efficient operations – controlled monopile positioning reduces risk and ensures smooth handling
Reduced downtime – lightweight, high-precision design facilitates faster installation
Versatile and customizable – optional upgrades allow adaptation to different vessels and project requirements
Durable and reliable – protective materials and robust construction extend tool life
Proven performance – successfully deployed on the Sofia wind farm without downtime, improving handling efficiency
Feedback from our client
“I look back to the collaboration with KENC in a positive way. We had a good,open, transparent relation and communication and I really appreciate their knowledge and workmanship for the design and construction of such a tool”
Gerrit Jansen - Project manager at Van Oord