PRESS RELEASE: VAN OORD SELECTS KENC ENGINEERING FOR DESIGN LIFTING TOOL SAINT-BRIEUC OWF
On the 12th of November leading marine contractor Van Oord, awarded Breman Machinery and KENC Engineering with the assignment to design and build a casing lifting adapter (CLA). The lifting tool supports the installation of 190 pin piles at Saint-Brieuc offshore wind farm.
The CLA can handle 275 tonnes and is designed to connect with the temporary casing used during drilling operations. It is equipped with redundant safety pin connections and can be operated remotely. The lifting tool includes a sub-sea IP camera to provide real-time images during fitting operations. In early February 2021 the CLA will be delivered to Van Oord. Eric Buining, manager director at KENC: “This is a great award for KENC Engineering, we are delighted to have been selected by Van Oord to contribute with our expertise and look forward to a smooth and successful project!”.
LET’S FIND OUT WHAT WE CAN DO TOGETHER
We love to hear from you! Give me a call or send an e-mail.
Vincent Vinkoert
Business Development Manager
+31 6 308 469 86 | vincent.vinkoert@kenc.nl